Current Tasks and Deadlines
- Continue construction
- Next meeting - Wednesday September 27th 4:00 PM Eric’s office
- Exchange elbow, pipe, and valve components to be 1.25 inches diameter
- Apply water sealant to wood for lower chamber
- Bandsaw lower/upper chamber circumferential plastic
- Investigate the availability of pre-formed cylinders (preferably cast so as to not crack)
- Visit the Grainger fan/blower shop to look for a blower with a stronger updraft
- Purchase a (larger) humidifer with a higher fog production rate
- Drill more holes in the PVC pipe (so that 4/5ths of the length has holes)
Next Week
- Continue construction
- Deliverables/Schedule Memo will be written by Curtis
- Section 2 of Final Report will be written by Curtis
- Memo for week of October 2nd will be written by Rion
Page last modified on September 21, 2006, at 09:56 PM