Team Memos and Reports
- Fall Final Report [12/05/06] detailing the overall design of the Tornado Machine.
- Section 4 (Rion/Jeff) [10/16/06] of the final report detailing quantitative Physical and Functional Requirements.
- Systems Readiness Review (Curtis) [10/31/06] detailing the integrated systems of the Tornado Machine design.
- Section 3 (Jordan/Randi) [10/16/06] of the final report detailing Physical and Functional Requirements.
- Fifth project memo (Jeff) [10/10/06] detailing the current project status.
- Fourth project memo (Rion) [10/03/06] detailing the current project status.
- Section 2 (Curtis) [10/03/06] of the final report detailing context and team information.
- Deliverables Memo (Curtis) [09/26/06] detailing the Fall semester deliverables and justifying the proposed schedule.
- Third project memo (Jordan) [09/19/06] detailing the schedule, budget, and current progress.
- Third project memo feedback [10/2/06].
- Executive Summary (Final) (Curtis [09/19/06].
- Executive Summary (Revision) (Curtis) [09/11/06].
- Second project memo (Randi) [09/11/06] detailing the schedule, budget, and current progress.
- Second project memo feedback [10/5/06].
- First project memo (Curtis) [09/05/06] detailing the schedule, budget, and current progress.
- Executive Summary (Draft) (Curtis) [09/01/06].
- Tornado Machine Project Proposal (Curtis) [04/26/06] from ME 3910 that describes the conceptual idea, customer needs, design specifications, schedule, and budget.
Page last modified on December 05, 2006, at 04:13 PM
