SLTEST Infrastructure Home | Site Location | Infrastructure | Instrumentation | Data | Research | Contacts | Prior to the site up-grade, experiments utilized generator-based power and radio-based communications. Furthermore, instrumentation literally had to be setup in a manner that left it exposed to the elements.The SLTEST site now affords dedicated power (110V, 208V and 480V), telephone communications, and a fiber-optic computer link. Other site improvements include a staging area upon which air-conditioned instrumentation and data acquisition trailers are located.
To better accommodate detailed studies in the immediate vicinity of the surface, a Near Surface Turbulence Measurement Platform ( NSTMP) was constructed as well.
The following are schematics and pictures of the test site.
![]() |
Copyright© 2001, Last Updated 08/15/01